This paper aims to convert a feeder of a bulk supply point (BSP) into a microgrid with rooftop solar PV plants sited in senior high schools along that MV grid in Ghana. The study used a solar PV Python optimization and forward–backwards algorithms to arrive at its results. The results show that rooftop PV plants sited in the study area can produce electricity to meet the feeder’s peak demand (8.2 MW) and have an extra 11.3 MW fed back to the grid. Cases 1, 2, 3 and 4 saw increases of 1.16%, 1.74%, 2.26% and 2.32%, respectively, higher than the nominal voltage of 34.5 kV. The base case total loss was 1.1 MW, and case 1 was 0.3 MW.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.