Abstract

The execution and duration of preventive maintenance (PM) activities have a significant impact on whether effective control is maintained over factory equipment while ensuring that the equipment is healthy and available for production. Although most PMs in the industry have similar structures, the task of generating an automated segmented view of the PM duration and flow to highlight inefficiencies and corresponding opportunities for improvement is complicated by a reliance on manual data entries by human operators. In addition, most optimization and analysis models treat a PM as a single activity while ignoring its parts. In this paper, two models for segmented PM durations are proposed: a parametric model to describe expected PM duration and a practical non-parametric model to generically segment a PM into its parts. Both models provide new insight into PM duration and a clear method to identify inefficiencies in PM duration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.