Abstract

Taking the panel dam as the research object, the finite element simulation analysis and the design working condition scheme comparison method are used to study the impermeability of the panel dam. The results show that the anti-seepage system is the key guarantee for the safety of the dam body, and it plays an important role in the anti-seepage safety of the dam system under the limit state. At the same time, the complete and effective upstream and downstream anti-seepage drainage system has obvious effects on the overall safe operation of complex hydraulic large-scale systems such as reinforced concrete face rockfill dams.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call