Abstract

A solution to the problem of seepage through an opening in a cutoff wall under an impervious structure lying on the ground level is presented with the use of the conformal transformation technique. The cutoff extends from the base of the structure to the impervious layer, which is overlaid by an isotropic and homogeneous porous stratum. The solution has been found to agree with established solutions for a partial cutoff wall and for a partial cutoff wall under a weir sitting on the ground level. Graphical presentation of the solution which takes into account the geometry, has been made for ready use of designers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.