Abstract

The feasibility of a harbour project, which involves dredging of an access channel, may to a large extent depend on the future maintenance dredging in the channel. It is therefore important to be able to calculate sedimentation in dredged channels with sufficient accuracy. In 1974 and 1975 the Danish Hydraulic Institute (DHI) carried out a study of the most feasible access channel to Warri Port situated in the Western Niger Delta, Nigeria. Two alternative entrances were studied and in conclusion it was recommended to improve the existing access channel through Escravos Entrance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.