Abstract
Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described, and possible bottlenecks identified. The calculations were done within the EC-funded REBIS project (Regional Balkans Infrastructure Study) and the Generation Investment Study (GIS) of new power generation capacities in the region. The market offering of generation facilities in Southeast Europe at forecast system peak loads in 2010 and 2015, for different hydrological conditions, was determined by the WASP (IAEA) and GTMax (Argonne NL) software. Calculations of power flows were carried out by using the PSS/E software (Siemens PTI). The article particularly discuses simulated power plant output and the operation of the transmission network in the Republic of Croatia.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.