Abstract
This paper presents a methodology for reactive power scheduling (RPS) of power system in the form of AC optimal power flow (AC-OPF) problem. The objective function is minimization of system total active power losses. The OPF optimally determines reactive power output of generating units and synchronous condensers, tap-changers ratio, shunt capacitor banks and reactors. The effect of tap-changer is modeled in the active and reactive power flow of transformer. The proposed method grantees secure operation of system in normal operating condition and also in contingency of transmission line outage. The validity of proposed method is studied based on IEEE RTS 24-bus. Results show the capability of suggested AC-OPF for RPS of system in base case as well as contingency of single line outage.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Operation and Automation in Power Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.