Abstract

Three-phase fault and load encroachment are balanced phenomena. A load encroachment function is incorporated in distance relay to improve the security of protection scheme, confuses with three-phase fault during high reactive loading condition. Zone 3 malfunction during such a situation often causes cascade line tripping leading to wide-area disturbance. In this work, voltage phasors of selected buses from a wide area measurement system (WAMS) are used to prevent zone 3 maloperation of a distance relaying scheme during load encroachment. The change in magnitude and phase of bus voltages are applied to discriminate three-phase fault from load encroachment. Performance of the proposed method is tested with New England 39 bus and IEEE 118 bus system simulated in EMTDC/PSCAD. Results show high accuracy as well as the speed of operation, is very fast of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.