Abstract

This research examined the use of a single facultative pond for treatment of an intermittent discharge from a UK campsite. The system was monitored over an 11-month period to determine the optimum time for discharge in terms of quality standards. The results showed that based on organic strength, discharge was possible in winter between November and March but February was the optimum to meet nutrient and suspended solids requirements. The pond showed rapid acclimatisation to the influent wastewater, with biochemical oxygen demand removal rates during the filling period of around 60 kg ha(-1) day(-1) and removal efficiencies of ∼95% after maturation. The system proved simple to operate. A major design factor is the requirement for storage of net incoming precipitation, which may provide dilution of residual pollutants but requires additional system capacity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.