Abstract

Projects need to be performed and delivered under certain con - straints. Traditionally, these constraints are scope, time and cost. The Scope Control process influences the factors that lead to project scope changes and control the impact of those changes, which a key issue for project success. It ensures that all requested changes and recommended corrective actions are processed and that changes are reduced or eliminated if they result in negative impact on projects. The scope control is considered from the investor's point of view, as achieving the project goals is of primary importance for the investor. The theoretical basis for the research is Dynamic Planning and Con - trol Methodology (DPM). Practical implications and adjustments are obtained, to result in an efficient system for managing changes throughout a project. Research was conducted through question - naire and interviews. Findings include reasons for and consequences of changes from the point of view of various stakeholders in the pro - ject, as well as recommended procedures for objective and practi - cal management of the changes. The study discusses the basic con - straints: cost and time. Further research should focus on quantify - ing and determining the quality impact of changes and impact of the project manager's competencies on managing changes. The recom - mended procedures are applicable for any building construction pro - ject, but specific goals and constraints have to be incorporated into the calculation. Furthermore, a database of projects and changes could be created to facilitate preliminary assessments of the impact of changes on future projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call