Abstract

Aimed at the problems that are generally existed in 10kV distribution network area, such as low automation and inaccessible remote monitoring, etc. An advanced distribution economic operation and optimization analysis system was developed based on smart area, which included smart distribution area, IDTT distribution terminal, communication network and main station construction. In aspect of smart distribution area construction, the original distribution area was updated and rebuilt, and based on which, the basic monitoring and analysis function of distribution area was achieved, moreover, a new type of smart distribution area based on ZJP-II-type of distribution terminal was designed. Its design principle and the main station construction scheme were discussed in details, and its main functions were summarized. Based on realtime monitoring, the whole system can make analysis on the area load rate, reliability rate, balance rate, and load increase trend, etc. as well as make timely response to the faults occurred in area, thus can achieve intelligent and refinement management on distribution area and provide guidance of the distribution area updating and rebuilding for the operation management units.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.