Abstract
In this paper, we aim at compiling the bibliography and the recent developments on scheduling problems involving undirected graphs. Two types of problems are considered: the mutual exclusion scheduling and the scheduling with batch-compatible jobs. We first consider the scheduling problems that can be solved by creating an undirected graph with a vertex for each job and an edge between every pair of conflicting jobs. Then, we consider the problem of minimising the makespan on a batch processing machine in which jobs are not at all compatible. This relation of compatibility is represented by an undirected graph called 'compatibility graph'.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.