Abstract
ABSTRACTThis study examines the effects of sequencing flexibility on the performance of rules used to schedule operations in manufacturing systems. The findings show that taking advantage of even low levels of sequencing flexibility in the set of operations required to do a job results in substantial improvement in the performance of scheduling rules with respect to mean flowtime. Differences in the mean flowtime measure for various rules also diminish significantly with increasing sequencing flexibility. Performance improvements additionally result for such due‐date related performance measures as mean tardiness and the proportion of jobs tardy. At high levels of sequencing flexibility, some nonparametric scheduling rules outperform the shortest processing time rule in terms of the mean flowtime criterion. Rules based on job due dates also outperform rules based on operation milestones in terms of tardiness related criteria at high levels of sequencing flexibility. The implications of these findings for the design of manufacturing systems and product design are noted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.