Abstract

This paper studies the single-machine group scheduling problem with convex resource allocation and learning effect. The number of jobs in each group is different, and the corresponding common due dates are also different, where the processing time of jobs follows a convex function of resource allocation. Under common due date assignment, the objective is to minimize the weighted sum of earliness, tardiness, common due date, resource consumption, and makespan. To solve the problem, we present the heuristic, simulated annealing, and branch-and-bound algorithms. Computational experiments indicate that the proposed algorithms are effective.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call