Abstract

This paper presents the results of a study that identified how often a probabilistic risk assessment (PRA)should be updated to accommodate the changes that take place at nuclear power plants. Based on a 7‐year analysis of design and procedural changes at one plant, we consider 5 years to be the maximum interval for updating PRAs. This conclusion is preliminary because it is based on the review of changes that occurred at a single plant, and it addresses only PRAs that involve a Level 1 analysis (i.e., a PRA including calculation of core damage frequency only). Nevertheless, this conclusion indicates that maintaining a useful PRA requires periodic updating efforts. However, the need for this periodic update stems only partly from the number of changes that can be expected to take place at nuclear power plants–changes that individually have only a moderate to minor impact on the PRA, but whose combined impact is substantial and necessitates a PRA update. Additionally, a comparison of two generations of PRAs performed about 5 years apart indicates that PRAs must be periodically updated to reflect the evolution of PRA methods. The most desirable updating interval depends on these two technical considerations as well as the cost of updating the PRA. (Cost considerations, however, were beyond the scope of this study.)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.