Abstract

To mitigate the effects of a corrosive operating environment, the Coast Guard has planned an extensive preventative maintenance program for its Sikorsky HH60J helicopters based on helicopter flight time. We construct a mixed integer linear program that schedules the weeks during which each helicopter undergoes maintenance, as well as the weeks during which a helicopter conducts operations either at Clearwater Air Station, Florida or at one of two deployment sites. The schedules must consider different maintenance types, maintenance capacity and various operational requirements, e.g., the number of helicopters simultaneously patrolling a deployment site. Using data from the operations at Clearwater, we generate optimal schedules on a Unix workstation with modest computing power in less than 3 min. Planners have been using our mixed integer linear program since January, 2005 for scheduling guidance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.