Abstract

A two-parallel-machine scheduling problem with machine-dependent availabilities where one machine is subject to tool changes and the other is subject to periodic maintenance is considered. The objective is to determine the start time of each tool change activity and schedule all the jobs to the two machines such that the makespan is minimized. Due to the NP-hardness of the non-approximability of the problem, there does not exist any polynomial time approximation algorithm with a worst-case ratio less than 2 for the problem unless P=NP. To solve small sized and moderate sized instances of the problem, a mixed 0–1 programming model is proposed. To solve large sized instances of the problem, nine heuristic algorithms that employ two classical dispatching rules, two assignment mechanisms and a post-optimization procedure are proposed. To evaluate the performance of the algorithms, some machine setting featured lower bounds are provided. Computational experiment shows that the average-case relative error ratio of the heuristic algorithm that based on the classical LPT rule, two assignment procedures and a post-optimization procedure is less than 8%, which implies that it is promising for problem and suitable for real-world application.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.