Abstract

This paper considers a single machine scheduling problem with preventive maintenance. In many cases, a machine must be maintained after it continuously works for a period of time. But most papers in the literature ignore non-availability of the machine. For this reason, this paper studies the problem of scheduling processing of jobs and maintenance of machine simultaneously. The objective is to minimise total completion time of jobs. The problem is proved to be NP-hard in the strong sense. Three heuristic algorithms and a branch and bound algorithm are proposed. Computational experiments are done to evaluate the effectiveness of the algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.