Abstract

SUMMARYIn this paper, we consider the problem of scheduling streaming applications described by complex task graphs on a heterogeneous multicore platform, the IBM QS 22 platform, embedding two STI Cell Broadband Engine processor. We first derive a complete computation and communication model of the platform on the basis of comprehensive benchmarks. Then we use this model to express the problem of maximizing the throughput of a streaming application on this platform. Although the problem is proven NP‐complete, we present an optimal solution based on mixed linear programming. We also propose simpler scheduling heuristics to compute mapping of the application task graph on the platform. We then come back to the platform and propose a scheduling software to deploy streaming applications on this platform. This allows us to thoroughly test our scheduling strategies on the real platform. We thus show that we are able to achieve a good speed‐up either with the mixed linear programming solution or using involved scheduling heuristics. Copyright © 2011 John Wiley & Sons, Ltd.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call