Abstract

This paper discusses the scheduling of reefer mechanics at container terminals. Reefer mechanics plug and unplug reefer containers such that due times are met. We outline the resulting scheduling problem and two simple heuristics. Subsequently, we present a simulation model to analyze the scheduling methods and the reefer-related processes in a realistic dynamic framework. Some results from the simulation experiments are also presented. They demonstrate the applicability of the heuristic and the use of the simulation model in practice. The simulation study was carried out for a real container terminal in the port of Hamburg, Germany.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.