Abstract

We revisit the problem, previously studied by Coffman et al, of scheduling products with two subassemblies on a common resource, where changeovers consume time, under the objective of flow-time minimization. We derive some previously unidentified structural properties that could be important to researchers working on similar batch scheduling problems. We show that there exists a series of base schedules from which optimal schedules can be easily derived. As these base schedules build on each other, they are easy to construct as well. We also show that the structure of these base schedules is such that batch sizes decrease over time in a well-defined manner. These insights about the general form of the schedules might also be important to practitioners wanting some intuition about the schedule structure that they are implementing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.