Abstract

This paper will relate initially to the scheduling characteristics of flexible manufacturing systems, and more specifically, the scheduling problems in flowshop and hybrid flowshop type systems representing interesting structures for the modeling of several problems resulting from the industrial world. Subsequently, we will focus our attention on the principal methods for solving scheduling problems, while presenting in the following the main published works for the aforementioned systems. Lastly, a comparative analysis will be carried out to highlight the fundamental ideas leading to the adoption of an effective approach capable of producing an optimal solution in a reasonable calculation time.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.