Abstract

We consider scheduling problems in the master slave model, which was introduced by Sahni in 1996. The goal is to minimize the makespan and the total completion time. It has been shown that the problem of minimizing makespan is NP-hard. Sahni and Vairaktarakis developed some approximation algorithms to generate schedules whose makespan is at most constant times the optimal. In this paper, we show that the problem of minimizing total completion time is NP-hard in the strong sense. Then we develop algorithms to generate schedules whose total completion time and makespan are both bounded by some constants times their optimal values.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.