Abstract

This paper addresses the problem of scheduling n preemptive jobs, which must be carried before a predefined overall deadline, on a set of m parallel machines. This deadline corresponds to the end of the planning horizon. Each job has its own processing time and a predetermined gain assigned to it when it is completely executed. Resources are distinguished into two types: shared and critical resources. Jobs requiring the same critical resource are subjected to conflicting constraints modelled by an undirected graph. The goal is to optimise three objectives: the main one is maximising the total gain of the performed jobs. The two others objectives consider the manner of the jobs accomplishment, where the number of interruptions and the total completion time have to be minimised. To solve this NP-hard problem, an improved simulated annealing based on: 1) a minimum lost gain strategy for vertices colouring procedure; 2) a new technique for the selection of a new solution is proposed. Extensive computational experiments show the capability of the proposed algorithm to obtain optimal solutions in a reasonable amount of CPU time for small instances, and significantly better results than in the rest methods of the literature for large instances.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call