Abstract
ABSTRACT The scheduling of (parallel) serial-batch processing machines is a task arising in many industrial sectors. In the metal-processing industry for instance, cutting operations are necessary to fabricate varying metal pieces out of large base slides. Here, the (cutting) jobs have individual, arbitrary base slide capacity requirements (sizes), individual processing times and due dates, and specific material requirements (i.e. each job belongs to one specific job family, whereby jobs of different families cannot be processed within the same batch and thus are incompatible). In addition, switching of base metal slides and material dependent adjustments of machine parameters cause sequence-dependent setup times. All these conditions need to be considered while minimising total weighted tardiness. For solving the scheduling problem, a mixed-integer program and several tailor-made construction heuristics (enhanced by local search mechanisms) are presented. The experimental results show that problem instances with up to five machines and 60 jobs can be tackled using the optimisation model. The experiments on small and large problem instances (with up to 400 jobs) show that a purposefully used batch capacity limitation improves the solution quality remarkably. Applying the best heuristic to the data of two real-world application cases shows its huge potential to increase delivery reliability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.