Abstract
Kanban is a pull production system that is very useful in Automotive Production Industry. Logistic systems in automotive industry, tries to apply the best system of logistic to supply the production lines and stations by bringing the parts and all requirements in best quantity and timing in order to come off the JIT specifications. In this article we try to exert a sequencing concept in Kanban card rotations to minimize the line shortage of parts causes stop in production procedure. Minimizing the Resupplying Cycle Times in production lines lead to less quantity of shortages that’s one important purpose of lean production. We introduce an appropriate sequencing and scheduling objective function related to Kanban card rotations to minimize some criteria affects the line inventories and causes some improvements on probable shortages. To know the weights of each job we used the Shannon’s Entropy method combined with SAW decision making method and we solved the sequencing and scheduling problem with total weighted tardiness objective function, using VNS heuristic method. To show the improvement and positive effects of our method we presented a real world case study and applied our model to a real world case study to observe the improvements in backlogs and tardiness in Kanban resupplying. Finally we presented the achieved improvements. General Terms Sequencing and scheduling, Shannon’s Entropy, Pull production systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.