Abstract

Aiming at the problem of reasonable scheduling of maintainer for railway freight trains, aiming at the maximum maintenance completion time and the work intensity of maintainer. An improved NSGA-II algorithm is proposed based on parallel machine scheduling. By using the ways of improving the initialization method, enlarging the population size, and employing pseudo-fitness function into the elite retention strategy solve the problems that the traditional NSGA-II algorithm is easy to fall into the local optimum and the convergence speed is slow. Finally, taking the actual maintenance of railway carriage of a depot as the research object, the improved NSGA-II algorithm and the traditional NSGA-II algorithm were respectively used to solve the model. The effectiveness of the algorithm is verified by comparing the optimization results with the actual production data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.