Abstract

Due to environmental circumstances encountered in manufacturing processes, operating machines need to be maintained preventively, so as to ensure satisfactory operating condition. This paper investigates a scheduling problem in a flexible job-shop system with maintenance considerations where each operation can be processed by a machine out of a set of capable machines, and so, jobs may have alternative routes. Machine failure rates are assumed to be time-varying. This is a real assumption comes from a fact in realistic environments, where failure rate of a machine is variable when environmental situations like shop temperature, shop light, shop humidity or even worker skill change significantly. Moreover, in order to more close the addressed problem into the situations encountered in real world, the processing times and due dates are considered to be stochastic parameters. A mixed integer linear programming (MILP) model is constructed for addressed problem with the objective of number of tardy jobs and a minimum total availability constraint. Then a simulation-optimization framework based on a simulated annealing (SA) optimizer and Monte Carlo (MC) simulator is presented to solve the problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.