Abstract
This paper addresses scheduling problems in single-stage and continuous multiproduct processes on parallel lines with intermediate due dates and especially restrictions on minimum run lengths. Whereas previous approaches require predetermined time slots or a maximum number of time slots to which only one task should be assigned, the proposed formulation does not use time slots within a time period. Therefore, the size of a model and its computation time are significantly reduced, with restrictions on several realistic situations, such as minimum run lengths, idle times of processes, and tests/maintenance, that are addressed in previous literature. Our approach is illustrated with various examples presented in the literature.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.