Abstract
Abstract This paper presents a time-constrained scheduling of a pipelined data path with the perspective of improving on-line testability. The testability is incorporated at the scheduling phase of the synthesis. Being a presynthesis method, the approach minimizes the area overhead. Operations of the same type are assigned to resources called functional units (FU). The on-line testing is carried out by capturing selective input and output variables of a circuit under test (CUT) in time frames called passes. The captured variables are shifted out to an external testing unit for verification. Each FU of the CUT is tested at least once in each pass. Minimizing the number of variables needed to test all FUs reduces the testing time. Thus, the scheduling is performed with the objective of improving on-line testability by minimizing the number of FUs and the number of variables needed to test all FUs. Promising results are obtained on benchmark examples.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.