Abstract

A new meta-heuristic gravitational search(GS) algorithm is proposed for simultaneous scheduling of machines, and two identical automated guided vehicles(AGVs) in a flexible manufacturing system(FMS). It minimize the makespan and completes the assigned jobs faster with possible savings of the resources. The adequacy of the algorithm is demonstrated by solving several problems and comparing with existing results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.