Abstract

Production of the aircraft becomes very important to facilitate many passengers of aircraft in Indonesia in the future. The design of a very complex aircraft requires proper project management. This study aims to perform the best scheduling project of empennage structure design of Indonesia’s aircraft with limited resources. Critical Path Method (CPM) is used to schedule the project based on activity and resource. CPM scheduling results in completion time for activity data for 400 working days. CPM scheduling after assigning human resources results in a longer completion time for 1023.47 working days. CPM scheduling is carried out by reallocating of human resources to produce a shorter completion time, and it results in completion time for 955 working days.

Highlights

  • Indonesia's need for connectivity with air transport is increasingly high in connecting resources, communities, and industries to protect the country's economy [1]

  • Critical Path Method (CPM) is a traditional management project in scheduling that is commonly used for various project

  • This studyshows three phases of calculating CPM schedulingin empennage design structure projectwhich are CPM scheduling based on activity data, activity and human resource data, and activity and human resource data after resource reallocation.The results of this studyare CPM scheduling based on activity data with completion time for 400 working days, activity and human resources data with completion time for 1023.75 working days, and activity and resource data after resource reallocation with completion time for955 working days

Read more

Summary

Introduction

Indonesia's need for connectivity with air transport is increasingly high in connecting resources, communities, and industries to protect the country's economy [1]. According to the Air Transport Statistics report of 2015 and 2016, in 2011 to 2016 the number of passenger on domestic destinations has an increasing trend [2], [3]. IATA report (2016) states the number of passenger aircraft in Indonesian is predicted to reach 220 million people in2034[4]. The design of an aircraft is a complex and difficult undertaking to obtain the optimal end product [5]. The complex aircraft design requires proper project scheduling to achieve the project’s success. Critical path method (CPM) is a traditional method of project scheduling that results in completion time based on activity and resource

Objectives
Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.