Abstract

Recently, motivated by applications in cloud computing, scheduling multiple two-stage flowshops with the objective of minimizing the makespan has drawn increasing attention. Motivated by the same applications, the current paper studies the problem of scheduling multiple two-stage flowshops with a deadline, with the objective of maximizing the profit of the jobs that can be completed by the deadline. Algorithms and complexity of the problem are investigated. For the case where the number of two-stage flowshops is part of the input, we present an efficient approximation algorithm with a constant ratio. The approximation ratio is improved via a study of the relationship between the problem and the multiple knapsack problem, combined with the recent progresses in the research in approximation algorithms for the multiple knapsack problem. By integrating techniques in the study of the classical Knapsack problem and the classical Makespan problem on multiple processors, plus additional new techniques, a polynomial-time approximation algorithm with a further improved approximation ratio is developed for the case where the number of flowshops is a fixed constant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.