Abstract
Project scheduling under uncertainty is a challenging field of research that has attracted increasing attention. While most existing studies only consider the single-mode project scheduling problem under uncertainty, this paper aims to deal with a more realistic model called the stochastic multi-mode resource constrained project scheduling problem with discounted cash flows (S-MRCPSPDCF). In the model, activity durations and costs are given by random variables. The objective is to find an optimal baseline schedule so that the expected net present value (NPV) of cash flows is maximized. To solve the problem, an ant colony system (ACS) based approach is designed. The algorithm dispatches a group of ants to build baseline schedules iteratively using pheromones and an expected discounted cost (EDC) heuristic. Since it is impossible to evaluate the expected NPV directly due to the presence of random variables, the algorithm adopts the Monte Carlo (MC) simulation technique. As the ACS algorithm only uses the best-so-far solution to update pheromone values, it is found that a rough simulation with a small number of random scenarios is enough for evaluation. Thus the computational cost is reduced. Experimental results on 33 instances demonstrate the effectiveness of the proposed model and the ACS approach.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.