Abstract
Scheduling Model for Prefabricated Component Assembly, Production, and Transportation Stage Based on GA for Prefabricated Buildings
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
https://doi.org/10.1109/access.2024.3394510
Publication Date: Jan 1, 2024 | |
License type: CC BY-NC-ND 4.0 |
Scheduling Model for Prefabricated Component Assembly, Production, and Transportation Stage Based on GA for Prefabricated Buildings
Join us for a 30 min session where you can share your feedback and ask us any queries you have