Abstract

The National Grid Company Plc. is responsible for the maintenance of the high voltage electricity transmission network in England and Wales. It must plan maintenance so as to minimise costs taking into account: • location and size of demand, • generator capacities and availability’s, • electricity carrying capacity of the remainder of the network, i.e. that part not undergoing maintenance. Previous work showed the combination of a Genetic Algorithm using an order or permutation chromosome combined with hand coded ‘Greedy’ Optimisers can readily produce an optimal schedule for a four node test problem [10]. Following this the same GA has been used to find low cost schedules for the South Wales region of the UK high voltage power network. This paper describes the evolution of the best known schedule for the base South Wales problem using Genetic Programming starting from the hand coded heuristics used with the GA.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.