Abstract

Power outages caused by factors outside the established policy will have an impact on the decline in electricity supply services and other cost related impacts. The reliability of the power plant feeder, in this case, is very important to monitor and maintain. The performance of power plant feeder can be reviewed based on the variable duration of power outage and power which fails to distribute. In this study, 1st order FTS (Fuzzy Time Series) is used to predict the feeder's performance through the predictive activity of both those variables in the actual year and the following year. The prediction results state that in 2017 there was a 20.54% decrease in performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.