Abstract

With increasing product customization, just-in-time part replenishment has become a significant scheduling problem in the automobile assembly system. This paper investigates a new unrelated parallel machine scheduling problem of an assembly line, where machines are employed to deliver material boxes from an in-house warehouse to workstations. The schedule is to appropriately specify the assignment and sequence of material boxes on each machine for minimizing line-side inventories under no stock-out constraints. By taking advantages of domain properties, an exact algorithm is developed to cope up with small-scale instances. In terms of real-world scale instances, a hybrid teaching–learning-based optimization metaheuristic is established by integrating teaching–learning-based optimization with a beam search technique. Experimental results indicate that the scheduling algorithms are effective and efficient in solving the proposed unrelated parallel machine scheduling.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call