Abstract

The paper is devoted to some single-machine scheduling problems with variable job processing times. The objectives are to minimize the makespan (i.e., the maximum completion time of all jobs), and to minimize the total completion time. For some special cases, we show that these problems can be solved in polynomial time. For some another special cases of the makespan and the total completion time minimization problems, we prove that an optimal schedule has an V-shape property in terms of processing times. We also propose a heuristic algorithm by utilizing the V-shape property.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.