Abstract
In this paper we consider unrelated parallel machine scheduling problems that involve the minimization of regular total cost functions. We first present some properties of optimal solutions and then provide a lower bound. These mechanisms are tested on the well-known practical problem of minimizing total weighted flow time on unrelated parallel machines. In doing so, we design a branch and bound algorithm incorporating the mechanisms derived for the general total cost function along with the ones derived specifically for the total weighted flow time criterion. Computational experience indicates that incoiporating reduction and bounding mechanisms significantly improves the performance of the branch and bound algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.