Abstract

We consider the following problem of scheduling with agreements: a set of jobs must be scheduled non-preemptively on identical machines subject to constraints that only some specific jobs can be scheduled concurrently on different machines. These constraints are represented by an agreement graph and the aim is to minimize the makespan. This problem is NP-hard. We study the complexity of the problem for two machines and arbitrary bipartite agreement graphs, in particular we prove the NP-hardness of the open problem proposed in the literature which is the case of two machines with processing times at most 3. We propose list algorithms with empirical results for the problem in the general case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.