Abstract

Given are n jobs, which have to be performed on a single machine within a fixed timespan 1,2,⋯T. The processing time (or length) of each job equals p, p ∈ ℕ. The processing cost of each job is an arbitrary function of its start-time. The problem is to schedule all jobs so as to minimize the sum of the processing costs.This problem is proved to be NP-hard, already for p=2 and 0–1 processing costs. On the other hand, when T=np+c, with c constant, the problem can be solved in polynomial time. A partial polyhedral description of the set of feasible solutions is presented. In particular, two classes of facet-defining inequalities are described, for which the separation problem is polynomially solvable. Also, we exhibit a class of objective functions for which the inequalities in the LP-relaxation guarantee integral solutions.Finally, we present a simple cutting plane algorithm and report on its performance on randomly generated problem instances.Keywordsschedulingcomputational complexitypolyhedral description

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.