Abstract
In this paper, the problem of scheduling multiple jobs in a flexible manufacturing cell with multiple machine stations is addressed. Due to the large capital investments that usually characterize flexible manufacturing systems (FMS), an area of control of great interest to system users is that of maximizing the system performance through the minimization of machine idle and setup times. The magnitude of total time spent on machine setups and idle times is influenced by the availability of jobs, job mix, similarities of jobs and job scheduling procedure used. Similar jobs on the same machine require less setup times. Similarly, the use of an adequate scheduling method also reduces total idle and setup times. Such reduction improves the flow times of jobs. In this paper, a heuristic algoritm for scheduling jobs with sequence dependent setup times in a FMS is presented. The measure of performance for evaluating schedule adequacy is the production makespan.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.