Abstract

In this paper, scheduling of robot cells that produce multiple object types in low volumes are considered. The challenge is to maximize the number of objects produced in a given time window as well as to adopt the schedule for changing object types. Proposed algorithm, POPStar, is based on a partial order planner which is guided by best-first search algorithm and landmarks. The best-first search, uses heuristics to help the planner to create complete plans while minimizing the makespan. The algorithm takes landmarks, which are extracted from user's instructions given in structured English as input. Using different topologies for the landmark graphs, we show that it is possible to create schedules for changing object types, which will be processed in different stages in the robot cell. Results show that the POPStar algorithm can create and adapt schedules for robot cells with changing product types in low volume production.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.