Abstract

This paper discusses mixed integer mathematical models and genetic algorithms (GAs) approach for finding an optimal schedule of the bottleneck machine for a company in the textile industry. Single-objective and multi-objective mathematical models and GA are used to obtain an optimal solution to minimise the maximum tardiness (Tmax). The comparison is made between mathematical models and GA according to the primary and secondary performance measures. Primary performance measure is Tmax, while secondary performance measure is number of tardy jobs (nt) and total tardiness (TT) values. The experimentation is performed for small and large size problems. All jobs have five different instances except for 150-job and 200-job problems. Due to memory and time limitations, only one sample could be solved for 150-job and 200-job problem. The experimental results indicated that, most of the time GA finds an optimal solution and proposes alternative schedules for both single-objective and multi-objective mathematical models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.