Abstract

In this paper, cellular manufacturing scheduling problems are studied. The objective is to minimize makespan (Cmax) considering part family in the manufacturing cell flow line where the setup times are sequence dependent. Minimizing Cmax will result in the increment of output rate and the speed of manufacturing systems which is the main goal of such systems. This problem is solved using Ant Colony Optimization (ACO), Genetic Algorithm (GA) operators, and local search technique. To show the validity of proposed approach, it is compared with a tailor-made heuristic algorithm, called SVS. The obtained results indicate that the proposed method is quite fast and efficient.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.