Abstract

In this paper, we study the scheduling problem of the imprecise mixed-criticality model (IMC) under earliest deadline first with virtual deadline (EDF-VD) scheduling upon uniprocessor systems. Two schedulability tests are presented. The first test is a concise utilization-based test which can be applied to the implicit deadline IMC task set. The suboptimality of the proposed utilization-based test is evaluated via a widely-used scheduling metric, speedup factors . The second test is a more effective test but with higher complexity which is based on the concept of demand bound function (DBF). The proposed DBF-based test is more generic and can apply to constrained deadline IMC task set. Moreover, in order to address the high time cost of the existing deadline tuning algorithm, we propose a novel algorithm which significantly improve the efficiency of the deadline tuning procedure. Experimental results show the effectiveness of our proposed schedulability tests, confirm the theoretical suboptimality results with respect to speedup factor, and demonstrate the efficiency of our proposed algorithm over the existing deadline tunning algorithm. In addition, issues related to the implementation of the IMC model under EDF-VD are discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.