Abstract

Since 2017, the Drinking Water Supply System (SPAM) of the Capital District (IKK) Ibu has not been functioning due to damage to the pipe network due to road widening work, damage to generators and pumps, thus PDAM West Halmahera will build a new SPAM network system with a gravity system and will analyze scheduling using the Program Evaluation and Review Technique (PERT) method using Microsoft Project 2021 to carry out development planning which has results where the time required for construction is 320 days and can be completed with a percentage level of 95.35%, with a critical path found in the implementation work occupational health and safety, preparation, piping work, procurement and installation of house connections and commissioning test work with a time of 273 days.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.