Abstract

We study a problem of scheduling a maintenance activity on a single machine. Following several recent papers, the maintenance is assumed to be deteriorating, that is, delaying the maintenance increases the time required to perform it. The following objective functions are considered: makespan, flowtime, maximum lateness, total earliness, tardiness and due-date cost, and number of tardy jobs. We introduce polynomial time solutions for all these problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.