Abstract

The problem of scheduling batch processors is important in some industries and, at a more fundamental level, captures an element of complexity common to many practical scheduling problems. We describe a branch and bound procedure applicable to a batch processor model with incompatible job families. Jobs in a given family have identical job processing times, arbitrary job weights, and arbitrary job sizes. Batches are limited to jobs from the same family. The scheduling objective is to minimize total weighted completion time. We find that the procedure returns optimal solutions to problems of up to about 25 jobs in reasonable CPU time, and can be adapted for use as a heuristic for larger problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.